Fabrication Services

Drill Rig Walking System

Columbia Industries

Greenberry was selected to fabricate and assemble critical portions of an X-Rig steel walking system for final deployment to an oil drilling contractor located on Alaska’s North…

Read More

VCE Mechanical & Piping Construction

International Paper

This project consisted of replacing the existing VCE with a new shell and tube falling film style evaporator. The work involved removal of local support…

Read More
Parker Drilling module

Modular Drilling Rigs

Parker Drilling

Greenberry Industrial was selected by the owner to fabricate and install piping systems and structural steel for two prototype modular oil drilling rigs for Alaskan…

Read More
aerial shot of the Arctic Containment System in the water

Arctic Containment System

Superior Energy Services

Greenberry Industrial was contracted by the project owner to provide fabrication and construction services for work associated with its Arctic Containment System (ACS) Project. The ACS is…

Read More

Stacker/Reclaimer Installation

Weyerhaeuser

Installation of a Greenfield chip unloading, storage (stacking), reclaiming, and feed system. Unloading – two 75′ Phelps Industries truck dump systems feeding three Dimisa conveyors…

Read More

Lithium Conversion

Georgia Pacific

Greenberry was selected by the owner as general contractor to build several phases of this fast track project.  Major phases Greenberry was responsible for included:…

Read More

River Water Pumping System

International Paper

This project consisted of installing a complete new pump station, vertical turbine pumps, and large bore piping system at the McKenzie River to provide the…

Read More

Total Mill Refurbishment

Cosmo Specialty Fibers

The facility previously owned by Weyerhaeuser Corp. in Cosmopolis, Washington was completely shut down in 2005. In 2010 the facility was purchased by a large…

Read More
tank services at shell

New Distribution Facility

Shell Oil Co.

As general contractor, Greenberry provided construction management and execution for all tank demolition, civil and concrete work, fabrication of structural steel and pipe spools, installation…

Read More
industrial piping

Diesel Pour Point Installation

Tesoro

This small cap project consisted of setting an additive tank and installing all peripheral process piping, valves, instrumentation and tie-ins.

Read More
railcar unloading

Butane Railcar Unloading

Tesoro

This project encompassed fabrication and installation of seven (7) piping systems as well as all pipeway tie-ins related to Railcar Unloading.

Read More
Greenberry refinery crew in FRCs

NOx Emission Reduction

Phillips 66

This petroleum refinery piping system upgrade was commissioned directly by the owner. Greenberry provided fabrication, installation and construction coordination services as well as multiple piping…

Read More
Storage tank fabrication

Storage Tanks for Offshore Drilling Support

ENI Petroleum

Greenberry was selected by the owner to design, fabricate, test, and transport nine shop welded tanks for the drilling support complex at ENI’s Nikaitchuq development…

Read More
Pharmaceutical process piping and vessel

Taurus Pharmaceutical Expansion

W.R. Grace Co.

This was a fast track project that we teamed with the owner and engineering firm to successfully complete. The project purpose was to bring on…

Read More
aerial photo of the port of everett terminal expansion

Port of Everett Terminal Expansion

Lehigh Northwest Cement Co.

Complete refurbishment of the existing Port bulk facility to handle approximately 500,000 tons of cement per year. The new terminal will include a 350 foot…

Read More
grout mixing plant pick

New Grout Mixing and Packaging Facility

Custom Building Products

This project required Greenberry’s crew to work in Nevada for six months to construct this complex material handling system.

Read More

Willamette Terminal Expansion

Ash Grove Cement

Complete refurbishment of the old Goldendale Alumina Ship Unloading Facility to handle cement. Work included the removal and refurbishment of over 900 feet of airslides.…

Read More
field installation

Henry Filter System Installation

Boeing

Working with the customer, Greenberry managed the development of an equipment installation plan, executed full installation, and supported full commissioning.

Read More
drum storage fabrication

Drum Storage Building

Eastman Kodak

Major four story process building addition with confidential process and mechanical systems. Numerous plant projects including civil, mechanical, structural, and process.

Read More

New Congealer

Xerox

Xerox has multiple manufacturing infrastructure upgrades that require the kind of expertise that Greenberry offers on a consistent basis.

Read More
melter installation at xerox

Melter Installation

Xerox

Xerox relied on Greeberry’s ability to install process equipment while their plant remained in full operation.

Read More

Ink Technology Expansion

Xerox

This project scope included a major expansion of Xerox’s existing Wilsonville, Oregon facility. The goal was to upgrade the facility to enable Xerox to release…

Read More

Plant Expansion

Tillamook Cheese

The owner contracted with Greenberry for its fabrication and field services expertise for this food processing and manufacturing upgrade.

Read More
aerial photography tank fabrication

Tank Farm Expansion

Yamasa Soy Sauce

This project was the second expansion and existing soy sauce production and distribution facility. The total increase in the tank farm size was over 7,000 sf. Greenberry…

Read More

Emergency Generator Canopy Systems

Army Corps of Engineers

Design/Build new Emergency Generator Containment and canopy system to house the Emergency Generator for the Detroit and Big Cliff Dam facilities.

Read More
container pick

Nuclear Shielded Container

Department of Energy

Greenberry was contracted to provide project management and engineering to expedite fabrication of one DOT 7A Type A Shielded Container for final delivery to Hanford.

Read More
Module fabrication bay

Modular MCC Building Fabrication & Assembly

Army Corps of Engineers

Greenberry was contracted to supply a new MCC building for the replacement fish ladder pumps at the John Day Dam on the Columbia River. Greenberry…

Read More

Selective Catalyst Reduction

Iberdrola Renewables

Iberdrola hired Greenberry for its fabrication expertise and its ability to go on-site for full-service mechanical installation.

Read More
conveyor belt for rail unloading and stacking system

Rail Unloading and Stacking System

TransAlta Generation LLC

This project included the Greenfield installation of a new rail unloading facility. The system was designed to unload 2″ x 0 coal at a nominal…

Read More

Cleaver Brooks Package Boiler Installation

Shell Oil Co.

Greenberry was selected by the owner as general contractor to remove 2 existing package boilers, and install new 7,000 lb/hr Cleaver Brooks Boiler (Supplied by…

Read More

Nebraska Package Boiler Installation

PacifiCorp Energy

Greenberry was selected as the design/build general contractor to install a new gas fired 10,000 lb/hr Nebraska package boiler, and Nash Vacuum/Hogging pump system.

Read More
site preparation for Mt. Poso Plant Conversion

Mt. Poso Plant Conversion

Mt. Poso Cogeneration

Greenberry was the general contractor for the installation of a Greenfield biomass unloading, storage (stacking), reclaiming, and feed system. The new system contained the following…

Read More

Bio-Fuels and Ethanol Handling Conversion

Sound Refining

Greenberry was selected by the owner as general contractor to modify their refining facility at the Port of Tacoma to so they could receive and…

Read More

A Bio-Fuels and Ethanol Terminal Upgrade

Shell Oil Co.

Greenberry was selected by the owner as general contractor to modify their Seattle/Harbor Island Terminal facility at the Port of Seattle so they could receive…

Read More