Oxygen Delignification Project

Weyerhaeuser, Longview, Washington

Project Description

Field assembly of ASME pressure vessel, fabrication and installation of process piping, pumps, and mixer

Service Provided

  • Field assembly of 220 ft. tall ASME vessel - three pieces with field joints
  • Top section piece was 110,000 lbs. The pick was using 308 ton Demag crane.
  • Fabricate and install 1,000 lineal feet of stainless steel process piping.
  • Process piping included 24", 16", 12", and 8"
  • Installation of new dilution pump and mixer

Project Statistics

  • On schedule
  • Zero lost time accidents

Project Timeline

  • Start date: December 2007
  • Completion date: March 2008

 

 

 

 

 

 

 

 

 

 

 

 