ProjectsProjectsProjectsProjects

Petro/Chemical Projects

Client Projects

W. R. Grace Co.

Albany, OR

Fast track project for new pharmaceutical line

Completion date: November 2011

ENI Petroleum

North Slope, AK

Design, fabrication, testing, and transportation of nine storage tanks

Completion date: July 2011

Shell Puget Sound Refinery

Anacortes, WA

Purchasing staff augmentation for maintenance, turnaround, planning, and capital projects.

Completion date: 2010 and ongoing

Conoco Phillips

Ferndale, WA

NOx Emission Reduction Project
This project included layout, excavation, installation of concrete foundation and apron; perform hot tap and tie ins into existing piping system; installation and fabrication of stainless steel and carbon steel pipe spools into existing pipe rack; fabrication and installation of utility piping systems; tie into existing OWS sewer systems; painting and installation of insulation and steam tracing; and installation of 16,000 pound ESNCR skid.

Completion date: September 2010

Tesoro Refinery

Anacortes, WA

Butane Railcar Unloading Project
This project encompassed fabrication and installation of seven (7) piping systems as well as all pipeway tie-ins related to Railcar Unloading. The process system modifications included: Butane, Nitrogen, Olefin- (2), Propane, Compressor and Vaporizer piping and supports. All were fabricated in Greenberry’s Burlington, WA shop and installed on site. Greenberry coordinated with operations on multiple shutdowns for loading arm piping tie-in’s in the rail car area.

Completion date: January 2010

Tesoro Refinery

Anacortes, WA

The Diesel Pour Point Project consisted of setting an Additive Tank and installing all peripheral process piping, valves, instrumentation and tie-ins. Greenberry fabricated all the pump and steam piping in the Burlington, WA shop, shipped to site and installed.

Completion date: January 2010

Tesoro Refinery

Anacortes, WA

Tank 165 Fire Foam system
All piping was fabricated in the Burlington, WA shop, sent to our galvanizers and shipped to the site for installation.

Completion date: January 2010

Tesoro Refinery

Anacortes, WA

Misc. Small Capital Projects
During Q4-2009 and into Q1-2010, Greenberry has been performing prep work including the demo of piping, equipment and structures to enable future process installation for the upcoming 2010 Benzine Reduction – (Bensat) project.

Completion date: Q3-2009 and ongoing

Shell Oil Terminal

Portland, OR

PDX Terminal B5 Project
Installation of new truck unloading pumps, OPL distribution piping, and new piping and supports to five existing storage tanks.

Completion date: September 2009

Shell Pipeline Co.

Seattle, WA

Bio-fuels and Ethanol Upgrade Project

Completion date: December 2008

Sound Refining

Tacoma, WA

Bio-fuels and Ethanol Upgrade Project

Completion August 2008

Hexion Specialty Chemical

LaGrande, OR

Methanol containment and piping upgrades.

Completion date: 2006

Hexion Specialty Chemical

Missoula, MT

Methanol containment and piping upgrades.

Completion date: 2006

BOC Edwards

Vancouver, WA

Civil, structural, and mechanical upgrades. Fabrication of TCS pressure vessel.

Completion date: 2005

Airgas

Vancouver, WA

Process and high pressure piping upgrades.

Completion date: 2005

Hexion Specialty Chemical

Springfield, OR

Methanol containment and piping upgrades.

Completion date: 2004

Shell Oil Co.

Portland, OR

New Distribution Facility

Completion date: December 2003

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Greenberry is a full service industrial mechanical contractor and fabricator serving clients throughout the U.S. and worldwide. Greenberry is stamped and certified by ASME, AISC certified for structural steel fabrication, and certified by the NQA-1 quality program for nuclear fabrication.