Cellular Phone Crystal Mfg

Toyocom Mfg, Longview, Washington

Service Provided

  • Detailed and fabricated 300 tons of structural steel for main manufacturing building
  • Detailed, fabricated, and installed four prototype autoclave heating jackets for the quartz crystallization process
  • Each jacket is 45' tall and incorporates 20 doors with heat (up to 1400 degrees) and air pressure seals (2.5 lbs/sq. in.)

Project Statistics

  • On time

Project Timeline

  • Start date: September 2000
  • Completion date: April 2001

Greenberry is a full service industrial mechanical contractor and fabricator serving clients throughout the U.S. and worldwide. Greenberry is stamped and certified by ASME, AISC certified for structural steel fabrication, and certified by the NQA-1 quality program for nuclear fabrication.