New Cogeneration Facility Project

Simpson Tacoma Kraft, Tacoma, Washington

Project Description

Greenberry was selected by the owner as general contractor to build a new Cogeneration building and the Cooling Tower for its new 65MW Cogeneration Project.  The project site posed many challenges as the only significant access to the building site was from the North side, and there was only access road.  The new building foot print was over 10,000 sf.

Service Provided

  • 100% of excavation.
  • Total of 141 piles driven to an average depth of 60 feet.
  • Over 240 tons of rebar set.
  • Over 3,500 yards of concrete placed.
  • Over 51,000 square feet of masonry installed.
  • Installation of the new condenser.  The total weight of the condenser was over 170,000 lb.
  • Over 500 tons of structural steel fabricated and installed.
  • 10,000 square feet of roofing installed.
  • Total of 12 windows installed.
  • 3 roll up doors and 12 man doors installed.

Project Statistics

  • Project completed on time.
  • Project completed within budget

Project Timeline

  • Start : January 2008
  • Completion : October 2008

Greenberry is a full service industrial mechanical contractor and fabricator serving clients throughout the U.S. and worldwide. Greenberry is stamped and certified by ASME, AISC certified for structural steel fabrication, and certified by the NQA-1 quality program for nuclear fabrication.