Lehigh Northwest Cement Company
Port of Everett Terminal Expansion Project
Everett, Washington
Cick Here for International Concrete Review Article
Project Description
Complete refurbishment of the existing Port bulk facility to handle approximately 500,000 tons of cement per year. The new terminal will include a 350 foot diameter 60,000-ton storage dome, docking facilities, conveying equipment, and loading bays for both truck and rail service.
Service Provided
- 10,000 yds of structural concrete formed and poured.
- 700 lf- 35 ft tall X 24 inch thick circular wall formed and poured
- 1.2 million lbs of rebar installed
- 400 lf of airslides fabricated and installed
- Two 600 ton cement silos fabricated and installed
- Three new air compressors
- Six new 600cfm air blowers
- 10,000 lf of compressed air and process piping. Fabricated, and installed
- 300 tons of heavy structural Iron fabricated and erected
- Electrical- installed 4 separate Plc systems, 150 KV transformer and all associated equipment
- Six saferack access systems
- Rebuilt 1,500 lf of conveyors, belts, structures steel, drives, skirts boards, and wind covers
- Installed a 220 diameter dome fluid bed system.
- Two truck automated ticketed load out facility
- Railcar load out system
- On site engineering support
- Commissioning and start-up support
Project Statistics
- On schedule and budget
- Worked 175,000+ safe hours
Project Timeline
- Start : January 2007
- Completion : August 2007